A hundred-odd projects. Here is how to read them.

Around half of what we deliver is under NDA, so this is a representative sample rather than a complete list. Where we cannot name a client we describe them precisely instead — an anonymised project is still evidence, a missing one is not.

Filter

Service
Region

10 projects

  • 2025

    A distribution business · Under NDA

    Taking over a system whose original vendor had vanished

    No documentation, no handover, no source access for two of the services. We reverse-engineered the estate, documented it, brought it under an SLA, and have run it since.

    Coverage since handover
    24/7
    LogisticsAmericas
  • 2025

    A European manufacturing group · Under NDA

    Condition-based maintenance across four production lines

    Maintenance ran on a fixed calendar, which meant servicing healthy machines and missing failing ones. We instrumented the lines and moved scheduling onto live vibration and thermal data.

    Production lines instrumented
    4
    Unplanned stoppages avoided
    31%
    ManufacturingEurope
  • 2025

    An energy services contractor · Under NDA

    Field inspection app for crews working beyond network coverage

    Inspectors were filling paper forms and re-keying them at the depot two days later. The app captures inspections, photos and signatures offline, and syncs the moment a crew is back in range.

    Days of reporting lag removed
    2
    Inspections per month
    3,400
    EnergyWider MENA
  • 2025

    A regional retail chain · Under NDA

    Offline-first POS for 60 branches on unreliable connectivity

    Branches in outlying areas lost connectivity daily, and the previous POS simply stopped selling. We rebuilt it offline-first: every terminal transacts locally and reconciles when the link returns.

    Branches live
    60
    Sales continuity offline
    100%
    RetailGulf
  • 2024

    A retail group · Under NDA

    A transformation roadmap sequenced by payback, not ambition

    The board had approved eleven initiatives to run in parallel. We sequenced them by dependency and payback, cut three that duplicated existing capability, and attached a cost to every remaining step.

    Initiatives, resequenced
    11 → 8
    RetailWider MENA
  • 2024

    A payments company · Under NDA

    Migration off on-premise with a rollback plan at every stage

    A regulated payments workload with no tolerance for a failed cutover. We moved it in seven stages, each independently reversible, and each rehearsed against production data before it ran.

    Reversible stages
    7
    Infrastructure cost reduction
    38%
    FinanceEurope
  • 2024

    A government services authority · Under NDA

    A bilingual services portal built to accessibility standard

    The existing portal failed accessibility audit and its Arabic was a machine translation of the English. We rebuilt it Arabic-first with full RTL, and took it through an independent WCAG 2.2 AA audit.

    WCAG 2.2 conformance
    AA
    Languages, equal footing
    2
    GovernmentGulf
  • 2024

    A national logistics operator · Under NDA

    One ERP across 14 depots and three legacy systems

    Three acquisitions had left the operator running three incompatible systems and reconciling them in spreadsheets. We consolidated onto a single ERP, migrated eleven years of records, and kept every depot operating throughout the cutover.

    Depots consolidated
    14
    Years of data migrated
    11
    Days of downtime
    0
    LogisticsGulf
  • 2023

    A private university

    Registration that survives the first day of term

    The old system collapsed under the registration-day spike every semester. We rebuilt the queueing and capacity model, then load-tested it at four times the historical peak.

    Peak load headroom
    EducationWider MENA
  • 2023

    A private hospital group · Under NDA

    The integration review that cancelled a replacement project

    The group was about to replace a hospital information system it had owned for four years. Our review found the failure was in two integration points, not the platform. We fixed those instead — for a fraction of the replacement budget.

    Root causes, not a platform
    2
    HealthcareGulf

Tell us what you're trying to build.